It is time to move on...
Wednesday, June 01, 2011
Tuesday, May 24, 2011
Trash Footprint
If the sophomores of AGS keep up their current trash creation rates, we will need a landfill large enough to hold 442,601 cubic feet of garbage. This is their lifetime trash footprint. You should know that only 100 students completed this assignment.
If you remember, the Great Pyramid in Egypt covers 13 acres and has a volume of 90,000,000 cubic feet. If an AGS sophomore is an average American student, how many students would we have to collect trash from to create a volume that is equal to the volume of the Great Pyramid?
Saturday, May 07, 2011
This post is for all those students who will not accumulate 0.75 cubic feet of trash.
No worries, just calculate the volume you currently have and divide it by the number of days you've been collecting. Say you have a box with a width of 7 inches, a length of 11 inches, and your trash reaches a height of 8 inches after 4 days. Now convert those measurements to feet (0.583 ft by 0.916 ft by 0.666 ft) and find the volume of trash you collected. In this case it would be 0.355 cubic feet. Divide this by 4 and you create 0.0889 cubic feet of garbage per day. I hope this helps.
Trashy McGee
Wednesday, May 04, 2011
New due date for part 1 of the Trash Project!
Thanks,
One more step you must take before you fill out the form.
Tuesday, May 03, 2011
Monday, April 25, 2011
Trash Talk - Designing your Container
In case the video was too quick and you don't know how to pause.